What does a buyer check before sending an RFQ?
A procurement engineer holding a drawing has a filter to run before anybody discusses price. The filter is six questions long and it takes about forty seconds.
PROCESS
Do you actually run the operation on the drawing? Name it the way an engineer names it rather than as a category.
MATERIALS
Which alloys and grades do you handle routinely? Stainless, tool steel, aluminium, titanium and plastics are all different answers.
TOLERANCE
What band do you hold as normal work, and what do you hold at your limit? A buyer needs the honest number rather than the best one you have ever achieved.
ENVELOPE
How big a part fits your machines? Maximum swing, bed size and sheet capacity all disqualify a supplier instantly when they are too small.
CERTIFICATION
Which standards do you hold, and what scope do they cover? ISO 9001 and AS9100 are checkable third-party facts rather than claims.
LEAD TIME
What is a typical lead time and a minimum order? A buyer with a line down needs the answer before the phone call, not during it.
Every one of those facts is on your shop floor already. The work is moving them onto the page in text a person and a machine can both read.
What order should the page run in?
| Position | Block | Purpose |
|---|---|---|
| 1 | H1 naming the process and the area | Matches what the buyer typed |
| 2 | Answer block of three sentences | Quotable by an assistant without editing |
| 3 | Specification table | The six qualifying facts in one place |
| 4 | Equipment list with capacities | Evidence the claim is real |
| 5 | Certifications with their scope | A third-party fact a buyer can verify |
| 6 | One contact route | The action, stated once |
The order is deliberate. A buyer who has to scroll past a company history to reach a tolerance figure opens the next tab instead.